The works comprised of internal alterations throughout the ground floor and in addition the first-floor toilets. Some components noted below:
Overview
Removal of structural wall with the installation of steel supporting beam to the underside of the first-floor joists as per the drawings supplied by (Morgan Associates)
Removal of internal partitions and installation of new
Suspended ceiling installation
New glazed partition system
Full mechanical installation
Full electrical installation
A number of structural penetrations through nominated walls